Installation of 5,602 LF of 8” water and 200 water services. For sewage, 7,322 LF of sewer and 34 manholes as well as 2,334 LF of 14” force main. We also installed 1 lift station 50’ in depth, 6,158 LF of storm drainage and 148 LF of an 8’x5’ RCB to support D.R. Horton’s newest residential community in Denton.
Installed complete water, sewer, and storm infrastructure—including over 10,000 LF of utility lines, vaults, risers, manholes, and catch basins—to serve 12 apartment complexes and an amenities center.
Installed over 12,000 LF of water, sewer, and storm lines—including meter vaults, fire lines, manholes, and headwalls—to support 8 new apartment units and Celina’s growing population.
Installation of over 12,000 linear feet of 8-inch to 24-inch gravity sewer in order to enhance the town’s wastewater infrastructure to support growth and long-term reliability.
Installation of 8,300 feet of 30” sanitary sewer pipe ranging from PVC to ductile iron pipe to help service future developments for Gainesville’s growing community.
Installation of 5,000 feet of 10-inch to 24-inch gravity sewer and a 7-foot diameter meter station to support efficient, long-term wastewater management for the growing community